The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 mile... read more
112 minutes
2018-10-01
English
United Kingdom
Video 125
94 days ago
You must be logged in to do that!
Sign up for the beta.